Bath Reno

24/11/01 - Master bath remodel project involves combining two bathrooms, adding double doors, removing two closets, and converting a bedroom to a dressing room walk in.

glenridge-bathrooms

👈🏻 before & after 👉🏻

The secondary vanity in the master was a previous addition which will be removed. Ginny will be taking the upstairs office and I will be moving mine into the den as a studio

Log

  • 24/11/01 - started an idea book of photos for finishing and other details.
  • 24/10/28 - timeline on this got bumped due to helene repairs. Contractor has given us an completion estimate of March 2025.

Design

We want to stay 'true' to the original house. The style is a contemporary craftsman built in 1979. The current bathrooms use hexagonal tiles, bulb makeup style vanity lighting, and contemporary hardware. Both showers/tubs are fiberglass insets but we'd like to move to a lipless tiled glassed shower and a freestanding tub. A second vanity/sink addition was made sometime during the 80s which we'd like to remove.

Materials

  • Tile - light colored
  • Lighting - dimmable led ceiling and bulb vanity
  • Cabinets - white/light/wood colored
  • Shelves - towel/laundry
  • Mirror - single mounted - no frame
  • Shower - wand attachments
  • Bath - freestanding round non-jetted
  • Windows - matching wood shutters